Common mistakes when working with backfill

Experience shows that most foundation problems on fill soils arise from common mistakes that can be easily avoided with the right approach. Common mistakes developers make •         Forgoing engineering surveys to save money is the most common and costly mistake. Without soil data, it's impossible to accurately calculate pile length and their bearing capacity. •         Using short piles that don't reach dense soil is the second most common mistake. Developers choose standard 2.5-3 meter piles without considering the thickness of the backfill. As a result, the piles rest on soft soil and settle. •         Installing piles immediately after backfilling, without allowing time for settling, causes the fresh backfill to compact under the piles, causing them to settle. The minimum curing period for backfill is 3-6 months with good compaction. •      ...